• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provi... Read More

Capacity :
25,000 KW/annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1126.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Paper Rolls & Facial Tissues
Paper Napkins, Toilet Paper Rolls & Facial Tissues

The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent... Read More

Capacity :
Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
341.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplu... Read More

Capacity :
7500 MT/annum
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1272.00Lakhs
Add To Inquiry Basket
Bicycle Tyres & Tubes from Natural Rubber
Bicycle Tyres & Tubes from Natural Rubber

Cycling is amongst the most sustaina... Read More

Capacity :
Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum
Plant and Machinery cost:
405.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
646.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer for Banana, Vegetables and Citrus
Micronutrients Fertilizer for Banana, Vegetables and Citrus

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nit... Read More

Capacity :
Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/D
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
30.00 Lakhs
Cost of Project :
30.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller

A solar cell, sometimes called a pho... Read More

Capacity :
Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverte
Plant and Machinery cost:
2162.88 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
31.00 %
TCI :
21918.00 Lakhs
Cost of Project :
21918.00Lakhs
Add To Inquiry Basket
Manganese From Electrolytic Process
Manganese From Electrolytic Process

Manganese is a key component in the production of steel. Although classified as a minor metal, the quantity of manganese produced worldwide each ye... Read More

Capacity :
Manganese Metal: 15,000 MT/Annum
Plant and Machinery cost:
663.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
2553.00 Lakhs
Cost of Project :
2553.00Lakhs
Add To Inquiry Basket
Low Carbon Silicomanganese
Low Carbon Silicomanganese

Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of s... Read More

Capacity :
Low Carbon Silicomanganese: 15,000 MT/Annum
Plant and Machinery cost:
1422.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
3936.00 Lakhs
Cost of Project :
3936.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from ... Read More

Capacity :
Plastic Granules 4500 Kgs/Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
64.52 %
TCI :
219.00 Lakhs
Cost of Project :
219.00Lakhs
Add To Inquiry Basket
Resin Bonded Diamond Wheels
Resin Bonded Diamond Wheels

The resin bond diamond wheels are mainly used for grinding tungsten carbide and non-metal materials. Various kinds of dimensions and shapes are ava... Read More

Capacity :
Resin Bonded Diamond Wheels:4000 Nos/Day
Plant and Machinery cost:
92.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.85%
Break Even Point (BEP):
57.77 %
TCI :
871.00 Lakhs
Cost of Project :
871.00Lakhs
Add To Inquiry Basket
Detergent Cake
Detergent Cake

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfacta... Read More

Capacity :
4MT/Day
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
228.00 Lakhs
Cost of Project :
228.00Lakhs
Add To Inquiry Basket
Automatic Packaged Drinking Water
Automatic Packaged Drinking Water

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind ... Read More

Capacity :
Packaged Drinking Water (1 Ltr. Size):120000
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
268.00 Lakhs
Cost of Project :
268.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity :
Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from C
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
8.00%
Break Even Point (BEP):
59.00 %
TCI :
613.00 Lakhs
Cost of Project :
613.00Lakhs
Add To Inquiry Basket
Iron Ore Mining (E O U)
Iron Ore Mining (E O U)

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracte... Read More

Capacity :
Iron Ore: 800 MT/Day
Plant and Machinery cost:
779.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
2485.00 Lakhs
Cost of Project :
2485.00Lakhs
Add To Inquiry Basket
Copper Sulphate from Metallic Scrap Copper
Copper Sulphate from Metallic Scrap Copper

Copper is one of the most widespread materials used in the production of electronic equipment and found in multiple appliances as, e.g. circuit boa... Read More

Capacity :
10000 MT /Annum
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
1208.00 Lakhs
Cost of Project :
1208.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
526.00 Lakhs
Cost of Project :
526.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity :
Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost:
448.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
44.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A syringe is a simple piston pump co... Read More

Capacity :
16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day)
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
255.00 Lakhs
Cost of Project :
255.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity :
300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost:
158.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
53.00 %
TCI :
351.00 Lakhs
Cost of Project :
351.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE

Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of... Read More

Capacity :
600 MT/Annum (Manganese Sulphate)
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
41.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A plastic syringe is a cylindrical t... Read More

Capacity :
22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum
Plant and Machinery cost:
636.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
42.00 %
TCI :
837.00 Lakhs
Cost of Project :
837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
6,00,00,000 Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables)

Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gaug... Read More

Capacity :
150 MT/Annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
42.00 %
TCI :
167.00 Lakhs
Cost of Project :
167.00Lakhs
Add To Inquiry Basket
COPPER INGOT  COPPER ASH FROM COPPER ORE
COPPER INGOT COPPER ASH FROM COPPER ORE

COPPER INGOT/COPPER ASH FROM COPPER ORE

Copper is the perfect material for recycli... Read More

Capacity :
3000 MT / Annum
Plant and Machinery cost:
279.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
45.00 %
TCI :
684.00 Lakhs
Cost of Project :
684.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity :
150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
104.00 Lakhs
Cost of Project :
104.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity :
1200 Cubic Meter/Day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity :
1008000 MT/Annum
Plant and Machinery cost:
13800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
55.00 %
TCI :
22400.00 Lakhs
Cost of Project :
22400.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity :
5000 MT/Day
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
21.00 %
TCI :
2396.00 Lakhs
Cost of Project :
2396.00Lakhs
Add To Inquiry Basket
Concentrated Manganese Ore
Concentrated Manganese Ore

India holds a leading position as a source of manganese ore. The output of this mineral being the third largest in the world. The ore occurs in var... Read More

Capacity :
7500 MT/Annum
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
40.00 %
TCI :
656.00 Lakhs
Cost of Project :
656.00Lakhs
Add To Inquiry Basket
Diamond Blade
Diamond Blade

Diamond blade is an instrument or cutting machines, which is broadly used for cutting of very hard materials. It is basically manufactured by using... Read More

Capacity :
20000 Nos./Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.90%
Break Even Point (BEP):
73.60 %
TCI :
143.00 Lakhs
Cost of Project :
143.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable syringes are a great innov... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
12345678910...
« Back7 8 9 10 11Next »

Showing 601 - 636 of 636 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR